Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
搜搜吧
欧洲杯滚球平台
赌博网站
bet365-China-download-admin@drf4865.com
Chess-and-card-entertainment-feedback@jatdj.com
Gambling-platform-contact@muuttuyothson.com
Sports-in-Sabah-info@jrshawls.net
Lottery-website-help@wjxhome.com
沙巴体育博彩
欧洲杯下注app
欧洲杯下注app
中国汽车网 汽车图片站
日语在线翻译
优购物
三亚人才网
淄博齐鲁网
北京社区网